Milland August Open Day 2025 Riders Briefing
Saturday 12th July 2025 – Milland, West Sussex
10:00am till 4:00pm
Parking open at 9:45am
sign-on and trails open at 10:00am
If your mates still want to attend this event there are still tickets here: Milland Open Day – 12th July 2025 – Southern Enduro
Online ticket prices: £14.50 for juniors – Under 18s, £16.50 for adults & £17.50 for ebikes.
If they didn’t sign up online they can pay on the day:
£20 cash on the day adults and £15 for under 18s.
This is not the actual postcode but its close:
Home Farm Hollycombe GU30 7LR Follow signs from here.
Here are the detailed instructions, please read all the points.
This is your riders briefing as there will not be one on the day.
As we all know Milland, West Sussex is private land but working with the land owner we have managed to get several open days and evenings through the year.
You will have access to all 9 trails at Milland which will be signposted.
General Site Rules:
There will be no access to the site before 12th July, this is private land and we want to be able to use this venue for years to come.
Parking – we have a big field so space out and give plenty of room between cars. Listen to instructions from the parking marshal.
There will be portable toilets on site
Hurtwood Inn will be offering Cold drinks (Including beer!) and stone backed pizza.
Cafe2u will be offering hot drinks.
Please take all your rubbish home with you.
Please follow all on-site safety signs.
First Aiders will be on site, if you need assistance flag someone
down in a hi-vis or go to sign-on.
Format/Instructions:
– Arrive on site and park up with lots of space around you.
-Park facing downhill. you will exit at the bottom of the field.
SEE MAP AT BOTTOM
– Go to sign on and verbally sign on and get your wrist band, please attach it to your bars.
Sign-on: Please queue at sign on tent to register when you are on site and get a wrist band.
That is sign on complete. All the trails are in the woodland above the parking field.
There has been changes at Milland, lots of forestry work has happen over the last year and they aren’t quite finished. A couple of important points:
- Stay off any log piles.
- Please do not touch any forestry machinery.
- Some of the fresh cut areas have lots of stumps. These sections will be marked as chill zones, please ride these sections art 50%. We have marked this on the map and will be marked on site with this sign:

IMPORTANT NOTE:
Photographers will need to go to sign on to give their name and number.
If anything is unclear, please email [email protected]
Scott and the Southern Enduro team.
